Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,165,809 members, 7,862,680 topics. Date: Sunday, 16 June 2024 at 11:06 PM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (3681) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4505334 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (3678) (3679) (3680) (3681) (3682) (3683) (3684) ... (3695) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Deeegbee: 12:22pm On May 24
ChybuzzDD:


10.3m is quite high.
I decked a double 2bedroom flat last week and i didn't spent upto that amount.
It was approximately 8m, with total labour cost being 1m out of the 8m.
Buy the materials yourself, and go for about 75% of the quantity he estimated, especially for 12mm rods, woods, bamboos and chippings for a start.
And bargain the total labour cost with your engineer as a whole.
Don't bargain it independently with each worker.

Thanks for this information.

Definately, 4M should comfortably deck a 3-bedroom flat.

What do you mean by chippings?

Can I share you the qty of materials I got as quote?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ChybuzzDD(m): 12:32pm On May 24
Deeegbee:


Thanks for this information.

Definately, 4M should comfortably deck a 3-bedroom flat.

What do you mean by chippings?

Can I share you the qty of materials I got as quote?

Chippings are granites

No, 4m won't likely be enough because of the current costs of rods, woods, cements and granites.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Deeegbee: 12:46pm On May 24
ChybuzzDD:


Chippings are granites

No, 4m won't likely be enough because of the current costs of rods, woods, cements and granites.

Possibly 4.5M then?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gentlesoul83(m): 1:16pm On May 24
alphabbey1:
I need someone to please criticize this quote given by an engineer...

Estimation For Decking

IRON- y16. 75length @ 18,000
Y12.400 length @ 10000=
Y10.98. Lengths@6500
Labour 200,000
Transport 30,000
Total = 4,825,000

Woods
1 by 6 200pic@800 =160,000
1 by 9 50pic @1600= 80,000
2 by 3 300pic @ 600= 180,000
1 by 12 420pic @ 1800=756,000
3inch Nail 2 bags 45,000
2inch Nail 2 bags 40,000
4inch Nail 1 bag. 22,000
Binding wire 20kg 32,000
Bamboo 400pic @1200=480,000
Workmanship 250,000
Total =2,045,000

MATERIALS FOR CASTING
2 HOWO 200,000
Gravel 40tons@6500=260,000
Transport 70,000
Dust 30ton 6500= 174,000
Transport 55,000
Filling 30,000
Casting 300,000
Water 50,000
Vibrator Available
Curing 5days 5000
Total 3,080,000

Electrical
8pack of 20mm pipe @ 12,000=96,000
5 pack of 25mm pipe @ 16,000= 80,000
4pkt’s 20mm cop 3000=12,000
2pkt of 20mm cop small@1900=3800
4pkt of 25mm cop 2000=8,000
1 pvc gum big one =4000
Workmanships. =. 60,000
Total 263,800

Plumbing
4” pipe 6pic @ 4500=27,000
4” elbow 10pic @1000= 10,000
2” pipe 15pic. 2500=37,500
2”elbow 15pic. 500=7,500
2” tee 10pic. @ 500=5000
4” tee 10pic@ 1000= 10,000
4by2 tee. 8pic@1200= 9600
Abro gum. =9000
PPR pipe 5pic 2000=10,000
Workmanships = 50,000
Total 175,600

Total = 10,393,600



The stages of the work is below and stage 4 is about to start

Stages of the work
*FOUNDATION LEVEL
*BLOCK WORK AFTER DPC BEFORE THE LINTEL
*LINTEL AND LEVELING BEFORE DECKING
*DECKING, SLABING BEFORE THE FIRST FLOOR
*FIRST FLOOR, BLOCK WORK undecided undecided
*LINTEL AND LEVELING
*PARAPET AND ROOFING

Please which location is this?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ChybuzzDD(m): 1:33pm On May 24
Deeegbee:


Possibly 4.5M then?

Let's say 5 to 6m.

Rods are very expensive now and about half of your total budget will go into just buying them.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Deeegbee: 1:55pm On May 24
ChybuzzDD:


Let's say 5 to 6m.

Rods are very expensive now and about half of your total budget will go into just buying them.

Yes, I know about 60% will go into buying of iron rods.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 2:13pm On May 24
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Olumighty123(m): 3:02pm On May 24
Bluffly:

But can I join reclin to armoured cable..The reclin will be above ground while the armoured will be in the ground. Just trying to see if I can reduce cost

Just buy pipe and let the wrecklin pass through it and you're good to go.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by VanuatuWycombe: 3:03pm On May 24
alphabbey1:
I need someone to please criticize this quote given by an engineer...

Estimation For Decking

IRON- y16. 75length @ 18,000
Y12.400 length @ 10000=
Y10.98. Lengths@6500
Labour 200,000
Transport 30,000
Total = 4,825,000

Woods
1 by 6 200pic@800 =160,000
1 by 9 50pic @1600= 80,000
2 by 3 300pic @ 600= 180,000
1 by 12 420pic @ 1800=756,000
3inch Nail 2 bags 45,000
2inch Nail 2 bags 40,000
4inch Nail 1 bag. 22,000
Binding wire 20kg 32,000
Bamboo 400pic @1200=480,000
Workmanship 250,000
Total =2,045,000

MATERIALS FOR CASTING
2 HOWO 200,000
Gravel 40tons@6500=260,000
Transport 70,000
Dust 30ton 6500= 174,000
Transport 55,000
Filling 30,000
Casting 300,000
Water 50,000
Vibrator Available
Curing 5days 5000
Total 3,080,000

Electrical
8pack of 20mm pipe @ 12,000=96,000
5 pack of 25mm pipe @ 16,000= 80,000
4pkt’s 20mm cop 3000=12,000
2pkt of 20mm cop small@1900=3800
4pkt of 25mm cop 2000=8,000
1 pvc gum big one =4000
Workmanships. =. 60,000
Total 263,800

Plumbing
4” pipe 6pic @ 4500=27,000
4” elbow 10pic @1000= 10,000
2” pipe 15pic. 2500=37,500
2”elbow 15pic. 500=7,500
2” tee 10pic. @ 500=5000
4” tee 10pic@ 1000= 10,000
4by2 tee. 8pic@1200= 9600
Abro gum. =9000
PPR pipe 5pic 2000=10,000
Workmanships = 50,000
Total 175,600

Total = 10,393,600



The stages of the work is below and stage 4 is about to start

Stages of the work
*FOUNDATION LEVEL
*BLOCK WORK AFTER DPC BEFORE THE LINTEL
*LINTEL AND LEVELING BEFORE DECKING
*DECKING, SLABING BEFORE THE FIRST FLOOR
*FIRST FLOOR, BLOCK WORK
*LINTEL AND LEVELING
*PARAPET AND ROOFING

It’s a pity; you didn’t mention your location. Experts here could have been able to advise you well.

Be careful, my brother. Dem go skwana your money.

Are the rods locally made or imported or TMT?

A local TMT (usual one) is not more than N1,050,000 per tonne for 16mm. Local ones are between N700k and N800k. Buy your binding wire at the place where the rods are bought too and it would be cheaper. If the binding wire looks too stronger for bending, your iron benders will help you burn it a little with tyres and it would become softer.

The wood planks you need to buy the ones that are cut with band (bahn) saw, for them to be straight and be useful for lintel and decking so as not to be leaking your concrete.

Don’t let them supply you anyhow woods because the prices quoted for the woods up there are not for the band saw type. There would be too many short and bad ones among them.

For wood planks of 1x9 and 1x6, kukuma buy 1x12 and pay them a token to rip the planks to your desired sizes. The off cuts can be useful for so many things onsite.
So, calculate all the 1 x 12 you would need together and negotiate it once.

For plumbing, ask him if he is using semi-thick or thick imported. I will advise you use thick imported.
Go and buy it yourself. Let the seller show you samples and you would notice the differences.

Be there when they are laying or fixing the pipes or let someone who is articulate be there.
Let them wash off the dust and dirt on the pipes and clean the pipes with dry cloth before applying gums. Let them apply the gums generously for you not to have a leaking pipe.

Those nails are expensive e.g. the 3” is between N30k to N36k per bag.

Iron bending could be negotiated to N45k per tonne of iron bent by an iron bender.
Just calculate cost per size of the rod bent, using the N45k (total number of rods in a particular mm, divided by N45k) then multiply it by actual number of the class of rods used by the bender.

There’s nothing listed there that you can’t buy by yourself.

5 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 6:06pm On May 24
Evening all.

Planning to resume my project

I need a rough estimate to get the following done.

1. Electrical Wiring (Considering going off grid in the next 5 years)
2. Plumbering system

Note:
1. It’s a 4 bedroom with 4 baths
2. Location is Mowe, Ogun State.
3. This estimate is to help me know how much I need to have at hand before I call on electrician and plumber.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chriswazo(m): 6:12pm On May 24
ChybuzzDD:


10.3m is quite high.
I decked a double 2bedroom flat last week and i didn't spent upto that amount.
It was approximately 8m, with total labour cost being 1m out of the 8m.
Buy the materials yourself, and go for about 75% of the quantity he estimated, especially for 12mm rods, woods, bamboos and chippings for a start.
And bargain the total labour cost with your engineer as a whole.
Don't bargain it independently with each worker.

What's your location?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 6:47pm On May 24
sekzy99:
Evening all.

Planning to resume my project

I need a rough estimate to get the following done.

1. Electrical Wiring (Considering going off grid in the next 5 years)
2. Plumbering system

Note:
1. It’s a 4 bedroom with 4 baths
2. Location is Mowe, Ogun State.
3. This estimate is to help me know how much I need to have at hand before I call on electrician and plumber.

Is it estimate you need or comprehensive bill of quantity
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 6:51pm On May 24
We are much affordable, and available for your project

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 7:06pm On May 24
topsy23:


Is it estimate you need or comprehensive bill of quantity

An estimate is okay.

Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Deeegbee: 7:31pm On May 24
ChybuzzDD:


Let's say 5 to 6m.

Rods are very expensive now and about half of your total budget will go into just buying them.

Alright boss, thx.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by justcallmenuel(m): 8:22pm On May 24
Good evening house, I want to know the best gauge for this roof and how much a square meter is sold for..

And which country has the best quality?

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:46pm On May 24
justcallmenuel:
Good evening house, I want to know the best gauge for this roof and how much a square meter is sold for..

And which country has the best quality?
Cc money121
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Reeefe(m): 9:38pm On May 24
kelvin1191:


By wet and dry design You mean hot and Cold Right? Where is the project located please.?
no. it means the shower area is seperate from the toilet area.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BizTrust: 9:49pm On May 24
Revamp your home with professional gypsum board ceiling installation and transform your living spaces into elegant, modern havens. Gypsum board ceilings are not only aesthetically pleasing but also offer practical benefits like fire resistance, sound insulation, and durability. By opting for expert installation, you ensure that your ceilings are perfectly aligned, smooth, and finished to the highest standards.

Our team of skilled professionals brings years of experience to every project, guaranteeing precision and attention to detail. We understand that each home is unique, and we tailor our services to meet your specific needs and style preferences. Whether you're aiming for a minimalist look, intricate designs, or concealed lighting effects, our gypsum board solutions can be customized to match your vision.

Beyond their visual appeal, gypsum board ceilings help to enhance the structural integrity of your home. They are lightweight yet sturdy, making them an excellent choice for various types of construction. Their adaptability also means they can seamlessly integrate with other interior design elements, providing a cohesive and sophisticated look.

In addition to their technical advantages, gypsum board ceilings contribute to a healthier indoor environment. They have natural thermal properties that can help regulate temperature, making your home more energy-efficient. Moreover, they are easy to maintain, requiring only occasional painting to keep them looking fresh and new.

Investing in professional gypsum board ceiling installation is a smart decision that adds value to your property. It is a cost-effective way to achieve a high-end finish without the need for extensive renovations. Our experts work efficiently and respectfully within your home, ensuring minimal disruption and a swift completion of the project.

Let us help you elevate the beauty and functionality of your home with our top-tier gypsum board ceiling installation services. Contact us today to schedule a consultation and take the first step toward your dream interior.
09062308261 OR 08112820381

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DUKEOFIBADAN: 9:57pm On May 24
MDDarah84:
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you

No, that building with interior is more than 20m

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:02pm On May 24
Scalabu:
Top 10 Architecture Firms in Abuja 2024

Abuja, the vibrant capital city of Nigeria, is rapidly evolving into a hub of modern architectural marvels. As the city expands, the demand for innovative and sustainable architectural designs continues to grow. This article delves into the top architecture firms in Abuja, highlighting their contributions to the city's skyline and their roles in pioneering cutting-edge designs that blend functionality with aesthetic appeal.

1. The Building Practice Ltd
2. Spazio Architecture
3. Arcon Group
4. UrbanSpace Architects
5. Benin Build Studios
6. ArchiConsult Ltd
7. Alpha Design Works
8. Pinnacle Planners
9. Supreme Structure Designs
10. Elite Architecture and Design

1. The Building Practice Ltd

Contact Number: +234 904 9721 840
Email: info@buildingpractice.biz
Website: https://buildingpractice.biz/


The Building Practice Ltd is a premier architecture firm known for its dynamic team of professionals dedicated to providing outstanding architectural services. Founded in 2013, the firm has rapidly grown to become a leader in the industry, aiming to be the most popular architectural practice in Nigeria by 2025. Their approach combines in-depth knowledge, skill, and artistry, ensuring each project evokes appealing moods and ideas capable of stoking human emotions.

Our Architectural Services

Our services encompass

1. Building Planning, Design and Documentation
2. Facility Management and Maintenance
3. Interior Design
4. Real Estate Development
5. Project Management
6. Green Building Documentation and Advisory
7. Building Fire Consultancy and Solutions
8.Building Construction
9. Construction Management

We collaborate with specialized companies, granting us access to world-class ideas, skills, and innovative technology. This partnership allows us to provide integrated and value-added services, efficiently solving complex problems. By adhering to local and international building codes, we ensure our projects meet the highest industry standards.

2. Spazio Architecture

Spazio Architecture is known for its innovative and sustainable designs. They specialize in creating spaces that are both functional and aesthetically pleasing. With a strong focus on client satisfaction, Spazio Architecture provides comprehensive services from initial concept to project completion.

3. Arcon Group

Arcon Group is a well-established firm in Benin, offering a wide range of architectural services. They have a reputation for delivering high-quality projects that meet the specific needs of their clients. Their portfolio includes residential, commercial, and industrial projects.

4. UrbanSpace Architects

UrbanSpace Architects is renowned for its modern and urban design solutions. They focus on creating vibrant and sustainable urban environments. Their expertise extends to urban planning, landscape architecture, and interior design.
5. Benin Build Studios

Benin Build Studios is a creative architecture firm that emphasizes innovative design and sustainable practices. They are known for their unique approach to residential and commercial projects, blending traditional and contemporary styles.

6. ArchiConsult Ltd

ArchiConsult Ltd offers a broad spectrum of architectural and engineering services. Their team of experts is dedicated to delivering projects that adhere to the highest standards of quality and efficiency. They have a strong track record in both the public and private sectors.

7. Alpha Design Works

Alpha Design Works is an architecture firm specializing in cutting-edge design and technology. They focus on creating smart buildings that are energy-efficient and environmentally friendly. Their portfolio includes high-tech commercial and residential buildings.

8. Pinnacle Planners

Pinnacle Planners is known for its strategic approach to architectural design and urban planning. They work closely with clients to develop projects that are both practical and innovative. Their services include master planning, building design, and project management.

9. Supreme Structure Designs

Supreme Structure Designs is a versatile architecture firm that handles a wide range of projects, from residential homes to large commercial complexes. They are committed to delivering high-quality designs that meet the unique needs of their clients.

10. Elite Architecture and Design

Elite Architecture and Design is a boutique firm that offers personalized architectural services. They specialize in luxury residential and commercial projects, providing bespoke solutions that reflect the client’s vision and lifestyle.

As Abuja continues to develop as a central hub of commerce, culture, and governance in Nigeria, the influence of its top architecture firms becomes increasingly evident. These firms are not just constructing buildings; they are creating the framework for the city's future, ensuring that it remains at the forefront of architectural innovation and sustainability.



It is against architecture code of ethics as specified by council of architecture to advertise an architectural practice

I EXPECT AN ACCLAIMED BEST FIRM TO KNOW THAT...

grin grin grin

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:11pm On May 24
alphabbey1:
I need someone to please criticize this quote given by an engineer...

Estimation For Decking

IRON- y16. 75length @ 18,000
Y12.400 length @ 10000=
Y10.98. Lengths@6500
Labour 200,000
Transport 30,000
Total = 4,825,000

Woods
1 by 6 200pic@800 =160,000
1 by 9 50pic @1600= 80,000
2 by 3 300pic @ 600= 180,000
1 by 12 420pic @ 1800=756,000
3inch Nail 2 bags 45,000
2inch Nail 2 bags 40,000
4inch Nail 1 bag. 22,000
Binding wire 20kg 32,000
Bamboo 400pic @1200=480,000
Workmanship 250,000
Total =2,045,000

MATERIALS FOR CASTING
2 HOWO 200,000
Gravel 40tons@6500=260,000
Transport 70,000
Dust 30ton 6500= 174,000
Transport 55,000
Filling 30,000
Casting 300,000
Water 50,000
Vibrator Available
Curing 5days 5000
Total 3,080,000

Electrical
8pack of 20mm pipe @ 12,000=96,000
5 pack of 25mm pipe @ 16,000= 80,000
4pkt’s 20mm cop 3000=12,000
2pkt of 20mm cop small@1900=3800
4pkt of 25mm cop 2000=8,000
1 pvc gum big one =4000
Workmanships. =. 60,000
Total 263,800

Plumbing
4” pipe 6pic @ 4500=27,000
4” elbow 10pic @1000= 10,000
2” pipe 15pic. 2500=37,500
2”elbow 15pic. 500=7,500
2” tee 10pic. @ 500=5000
4” tee 10pic@ 1000= 10,000
4by2 tee. 8pic@1200= 9600
Abro gum. =9000
PPR pipe 5pic 2000=10,000
Workmanships = 50,000
Total 175,600

Total = 10,393,600



The stages of the work is below and stage 4 is about to start

Stages of the work
*FOUNDATION LEVEL
*BLOCK WORK AFTER DPC BEFORE THE LINTEL
*LINTEL AND LEVELING BEFORE DECKING
*DECKING, SLABING BEFORE THE FIRST FLOOR
*FIRST FLOOR, BLOCK WORK
*LINTEL AND LEVELING
*PARAPET AND ROOFING

What baffles me most on here is people look at a quotation and they conclude it's too much.... WITHOUT HAVING A VIEW OF THE AREA OR DETAILS associated with the estimate.

For note. A 2 bedroom can cost 1m to build while a 1 bedroom wld cost 2m.

Its not by number of rooms and it's not by area alone...

My advice is simple.
Get sm1 to do the estimate for you for comparism sake... The elevations you attached don't have enough details to know if the estimate is excessive or not.

Goodluck.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 10:16pm On May 24
alphabbey1:
I need someone to please criticize this quote given by an engineer...

Estimation For Decking

IRON- y16. 75length @ 18,000
Y12.400 length @ 10000=
Y10.98. Lengths@6500
Labour 200,000
Transport 30,000
Total = 4,825,000

Woods
1 by 6 200pic@800 =160,000
1 by 9 50pic @1600= 80,000
2 by 3 300pic @ 600= 180,000
1 by 12 420pic @ 1800=756,000
3inch Nail 2 bags 45,000
2inch Nail 2 bags 40,000
4inch Nail 1 bag. 22,000
Binding wire 20kg 32,000
Bamboo 400pic @1200=480,000
Workmanship 250,000
Total =2,045,000

MATERIALS FOR CASTING
2 HOWO 200,000
Gravel 40tons@6500=260,000
Transport 70,000
Dust 30ton 6500= 174,000
Transport 55,000
Filling 30,000
Casting 300,000
Water 50,000
Vibrator Available
Curing 5days 5000
Total 3,080,000

Electrical
8pack of 20mm pipe @ 12,000=96,000
5 pack of 25mm pipe @ 16,000= 80,000
4pkt’s 20mm cop 3000=12,000
2pkt of 20mm cop small@1900=3800
4pkt of 25mm cop 2000=8,000
1 pvc gum big one =4000
Workmanships. =. 60,000
Total 263,800

Plumbing
4” pipe 6pic @ 4500=27,000
4” elbow 10pic @1000= 10,000
2” pipe 15pic. 2500=37,500
2”elbow 15pic. 500=7,500
2” tee 10pic. @ 500=5000
4” tee 10pic@ 1000= 10,000
4by2 tee. 8pic@1200= 9600
Abro gum. =9000
PPR pipe 5pic 2000=10,000
Workmanships = 50,000
Total 175,600

Total = 10,393,600



The stages of the work is below and stage 4 is about to start

Stages of the work
*FOUNDATION LEVEL
*BLOCK WORK AFTER DPC BEFORE THE LINTEL
*LINTEL AND LEVELING BEFORE DECKING
*DECKING, SLABING BEFORE THE FIRST FLOOR
*FIRST FLOOR, BLOCK WORK
*LINTEL AND LEVELING
*PARAPET AND ROOFING

For me ooo electrical and plumbibg is okay
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:23pm On May 24
MDDarah84:
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you

Let me list 20 things that wld cost more than 1m while building this.

1. Foundation
2. German Floor
3. Blockwork
4. Parapet
5. Roofing (roof covering)
6. Carcass and ceiling
7. Window and doors
8. Ironmongery
9. Electrical /Plumbing piping
10. Electrical wires
11. Electrical/plumbing fittings
12. Plastering
13. Screeding / painting
14. Tiles only
15. Bricklayer Workmanship
16. Carpenter/ Iron Bender /Tiler workmanship
17. Furnitures (wardrobe and kitchen cabinet)
18. Fence work
19. Septic tank and soak away
20. Compound work


If all the above cost only 1m, then you've already spent 20m but some of the items above eg Electrical wires, roof, septic tank, etc cost more than 1 million.

Answer: 20 million can't build this sir.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 5:55am On May 25
We are available for your pop, wall screeding, artwork, tv console contact us on 07069462837

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BrickDevo: 11:40am On May 25
MDDarah84:
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you
Yes, location dependant

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ishadfurnitures: 12:27pm On May 25
Chat 08099212590 for a full Comprehensive Bill of Quantity dont speculate let me give you a Quotation for Materials and Labour involved not its noy free but it will cost you a token fee.
MDDarah84:
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by uncleteeh(m): 1:32pm On May 25
BrickDevo:

Yes, location dependant
I'm not sure 20m will deliver such structure with quality finishes.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ChybuzzDD(m): 1:44pm On May 25
BrickDevo:

Yes, location dependant

Prices of building materials are generally the same across the country these days(except few stuffs like granites that are costlier in the SE & SS regions), and workers charge approximately the same amount, irrespective of state/locality.

I'm not sure location favours anyone currently.

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dongc(m): 2:03pm On May 25
saydfact:


What baffles me most on here is people look at a quotation and they conclude it's too much.... WITHOUT HAVING A VIEW OF THE AREA OR DETAILS associated with the estimate.

For note. A 2 bedroom can cost 1m to build while a 1 bedroom wld cost 2m.

Its not by number of rooms and it's not by area alone...

My advice is simple.
Get sm1 to do the estimate for you for comparism sake... The elevations you attached don't have enough details to know if the estimate is excessive or not.

Goodluck.
You are a Gem...I always look forward to your comments...Thank you for all your efforts and contributions...cheers

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DUKEOFIBADAN: 2:35pm On May 25
I was looking for a small bachelor pad design to build on my farm when I came across this building. I calculated the money spent with the Nigeria exchange rate and it was 6 million naira for a single room and a toilet. I think this is way too much for such building, not even a mini room and parlor with kitchen. Who has a mini one bedroom bungalow design with a big store attached to it to keep livestock feeds?

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 3:18pm On May 25
Okay,thanks bro

quote author=saydfact post=130127087]

Let me list 20 things that wld cost more than 1m while building this.

1. Foundation
2. German Floor
3. Blockwork
4. Parapet
5. Roofing (roof covering)
6. Carcass and ceiling
7. Window and doors
8. Ironmongery
9. Electrical /Plumbing piping
10. Electrical wires
11. Electrical/plumbing fittings
12. Plastering
13. Screeding / painting
14. Tiles only
15. Bricklayer Workmanship
16. Carpenter/ Iron Bender /Tiler workmanship
17. Furnitures (wardrobe and kitchen cabinet)
18. Fence work
19. Septic tank and soak away
20. Compound work


If all the above cost only 1m, then you've already spent 20m but some of the items above eg Electrical wires, roof, septic tank, etc cost more than 1 million.

Answer: 20 million can't build this sir. [/quote]

1 Like

(1) (2) (3) ... (3678) (3679) (3680) (3681) (3682) (3683) (3684) ... (3695) (Reply)

Viewing this topic: buzzetin(m), doncafu(m) and 2 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 71
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.